Project References
“Built. Proven. Trusted.”
Our solutions have been trusted by developers, architects, and contractors across Thailand in both new builds and retrofit applications.
Discover how we delivers real saving, speed, and performance.
Carparks · Airports · Stations · Platforms
Long spans and high durability under dynamic use.
Ideal for beamless car parks, platform decks, and high-traffic
environments where robustness meets speed.
- 2025
- Infrastructure / Special Structures
- Bangkok Metropolitan Area
1.8
Tons of CO₂e
Saved
Client Testimonials
What Developers Say
.. it is anticipated that 32 kgCO₂e per m² of floor area could be saved, translating to a saving of over 1,000 m³ of concrete for the
project. In addition, the use of the BubbleDeck system contributes to a cleaner construction site and
enables faster construction progress, further enhancing the project’s overall sustainability and efficiency.
Frasers Property (Thailand) Public Company Limited
Sustainability Report 2025
Stact (BubbleDeck) gives us great freedom in design. Many ideas that were once just concepts can now actually be realized. Most importantly, it complies fully with engineering principles, so we can build with peace of mind. As a bonus, it significantly reduces material usage—making it environmentally friendly as well.
Mr.Prachaya Charoencharaskul
Managing Director,
TONG CHARAS SAENG COMPANY LIMITED
Project: PARK91 and AURORA VILLAGE
Insights from Architects & Engineers
Reducing the overall structural weight by up to 20% has a significant positive impact on earthquake resistance. It helps lower the forces involved, reduce building sway, and significantly lessen the damage to the structure
Assoc. Prof. Chatpan Chintanapakdee
Ph.D., expert in earthquake-resistant structures,
Department of Civil Engineering, Chulalongkorn University.
We may not be able to avoid earthquakes, but we can prepare our buildings to withstand them. Reducing structural weight is one of the most effective methods. The lighter the mass, the lower the inertial force, which means less load on the structure. This improves the building’s earthquake resistance and lowers the risk of collapse.
Mr. Somsakdi Seubsai
Senior Vice President of Engineering Design,
Stonehenge Co,. Ltd.
Feedback from Site Teams & Contractors
The BubbleDeck system integrates seamlessly with our construction workflow. The on-site installation process is clear and straightforward, enabling our team to work efficiently.
Compared to conventional construction methods, we can significantly reduce construction time while maintaining consistent quality control. This aligns well with the modern contractor’s approach, which emphasizes systematic processes, precision, and continuity of work.
Mr. Somkiat Chaitanasakul
Project manager,
JOMTAKOL GROUP
From our experience using the BubbleDeck structural floor system, we found it to be an innovative and modern solution.It can be installed quickly, reduces construction steps, and significantly saves both time and costs compared to traditional beam-slab systems. Additionally, it simplifies on-site operations as materials do not need to be stockpiled at the construction site, thanks to direct delivery from the factory along with clear and easy-to-understand installation instructions.Moreover, factory production ensures greater confidence in quality control and standards. This system is well-suited for advancing industrialized construction technologies, reducing the reliance on labor—especially in areas with labor limitations—and enabling faster construction overall.
Mr.Panote Mongkoltummakul
Managing Director,
PMEC ENGINEERING CO.,LTD.
I think this system is easy to install, works quickly, and is simple to use. Also, I find it to be quite strong — it feels even stronger than the beam system, because after the concrete is poured over the slab and columns, everything becomes a single solid structure.
Hoeurt Hav
Foreman, Grandio Vibhavadi-Rangsit
The bubbledeck helps reducing the construction cost and time by replacing the formwork. It also helps reducing the carbon footprint by reducing the concrete quantity in slabs and the foundation system.
Dr. Kanokpat Chanvaivit
Technical Director
Bouygues Thai Ltd.
: Trusted by Project Consultants
For the expansion of a building area adjacent to a large office building that remains fully operational, the use of BubbleDeck enabled the Amazon Cafe project at KPN Tower to carry out the structural works quickly and accurately, while minimizing disruption to building occupants. It is clearly an effective solution for structural projects in buildings with limited space.
Mr.Pongpat Jirangpitakkul
Managing Director,
ME Consulting Group
The BubbleDeck slab system is regarded as an innovative solution that has introduced new methods of construction. The system involves a combined process in which prefabricated slabs are manufactured in a factory, allowing for convenient installation and effective quality control. As a result, the construction process becomes faster and more time-efficient.
Mr.Ong-Ard Chana
Project Manager,
22 Consultant & Management
Voices for a Greener Future
As an ESG expert, I consider the BubbleDeck flooring system to be a clear example of construction innovation that effectively addresses sustainability. It reduces the use of concrete and steel while maintaining the structural integrity, which leads to a significant reduction in greenhouse gas emissions during construction. Moreover, the system helps maintain a cleaner construction site, accelerates the building process, and enhances the overall project efficiency. It truly supports long-term environmental goals
Mr.Wicha Saweangsri
ESG Expert, TREES-A NC/CS , CFO and CFP Consultant and Verifier List TGO Scheme.
From the People Who Live With It
“I didn’t know slabs could make such a difference. Our home is open, peaceful — and we moved in faster than expected.”
P’Somchai
Chiang Mai
“I told my architect I want this floor system — it just made more sense for the future.”
K. Ananya
Bangkok
Proof in Numbers
Real-world impact from real-world projects.
Projects
Completed
Completed
0
Faster Construction Time
30-
0
%
the average cycle
time per floor.
time per floor.
0
days or fewer
Average Concrete
Reduction per Project
Reduction per Project
0
%
Typical Clear
Span Achieved
Span Achieved
0
m
Trusted by Developers, Architects, and Builders Nationwide